Project Description
ADVANTAGES & BENEFITS:
– Fast set curing system (6-8 sec gel time; 15 sec. tack-free time)
– Seamless coating
– No VOC’S and no odors
– Ambient moisture insensitive during application
– Application at low temperature on site
– Short down time
SUBSTRATES:
Iron, steel, wood, GRP (Glass Reinforced Polyester)
SUITABLE FOR:
General purpose coating where it is not requested very high performance.
Notes: Request our technical office the technical report of chemical resistance.
WAY OF APPLICATION
Spraying with a suitable high pressure and high temperature plural component equipment.
SUBSTRATES PREPARATION
Before application check the surface is dry, cleaned and sound (internal moisture not above 15%).
Steel, iron or wood:
Surface must be cleaned, dry and with coarse profile. It could be dealt with sandblasting or shotblasting.
GRP (Glass Reinforced Polyester):
Surface must be cleaned, dry, shotblasted, scarified or sandblasted and. filled with putty in case of cracks or holes. In case of recent GRP wait until the end of styrene migration.
In any case we suggest to remove dust or sandblsting remains before the application. In this case we sugest to apply a thin layer of epoxy or polyurethane primer.
For other kind of surfaces please contact our technical office. In any case we suggest to apply a thin layer of epoxy or polyurethane primer.